Crude Oil Pipeline Release

Client

  • Oil & Gas Producer

Problems

  • Light-Mid Crude Oil
  • Hydrocarbon Values ± 9810 ppm

Project Summary

The impacted soil was located in the province of Saskatchewan and was contaminated with petroleum hydrocarbons. The targeted remediation goals were 1,000 ppm in the C11-C22 fraction and 4,000 ppm in the C23-C60 fraction. On-site, there was a total of approximately 750 m3 to be treated. The scope of work was to initiate treatment of the soil by way of bioremediation using a windrow method with frequent turning and was completed within a 44-day timeframe.


Results and Advantages

  • Achieved successful remediation (610 ppm in the C11-C22 fraction and 939 ppm in the C23-C60 fraction).

Duration and Cost

  • Project completed in 44 days.
  • Project Cost: ± $35,000.00 (On Budget)