Client
Problems
- Hydrocarbons
- C6 - C10 ± 650 ppm
(Criteria = 130 ppm)
- Benzene ± 4.4 ppm
(Criteria = 0.048 ppm)
- Toluene ± 21 ppm
(Criteria = 0.16 ppm)
- Ethyl-Benzene ± 1.8 ppm
(Criteria = 0.36 ppm)
Project Summary
The impacted soil was contaminated with petroleum hydrocarbons resulting from an abandoned pipeline. The targeted remediation goals were the Alberta unconditional Tier 1 guidelines for hydrocarbons in a coarse-grained soil and an agricultural land use. On-site, there was a total of approximately 2,000 m3 to be treated. The scope of work was to process material by means of our dual-drive Allu bucket attachment.
Results and Advantages
- Achieved successful remediation for Benzene, Toluene, Ethyl-Benzene and F1 (C6 - C10) petroleum hydrocarbons.
Duration and Cost
- Project completed in 2 weeks.
- Project Cost:
± $27,500.00 (On Budget)