Active Upstream Oil & Gas Location

Client

  • Oil & Gas Producer

 

Problems

  • Hydrocarbons
  • C6 - C10 ± 3,700 ppm
    (Criteria = 260 ppm)
  • Benzene ± 100 ppm
    (Criteria = 0.05 ppm)
  • Toluene ± 140 ppm
    (Criteria = 0.01 ppm)
  • Ethyl-Benzene ± 100 ppm
    (Criteria = 0.1 ppm)
  • Xylene ± 400 ppm
    (Criteria = 0.1 ppm)

 

Project Summary

The impacted soil was contaminated with petroleum hydrocarbons resulting from a former on-site underground storage tank (UST). The targeted remediation goals were the Saskatchewan Environment Criteria for BTEX and PHC fractions in a fine-grained surface soil using an agricultural land use. A total of approximately 1,100 m3 was transported to a designated treatment pad where bioremediation was initiated by utilization of our dual-drive Allu bucket attachment. The remaining bioremediation process was completed within a windrow turner.

 

Results and Advantages

  • Achieved successful remediation for Benzene, Toluene, Ethyl-Benzene, Xylene and F1 (C6-10) petroleum hydrocarbons (results were <0.04 ppm, <0.10 ppm, <0.10 ppm, <0.10 ppm, and a range of 20 to 46 ppm respectively).
  • Treated material was subsequently used as daily cover at the landfill.

 

Duration and Cost

  • Project completed in 2 months.
  • Project Cost:
    ± $57,000.00 (on budget)

 